West Broadway in Thermopolis

Donnell & Allred, Inc. was hired by WYDOT to design the reconstruction of West Broadway Street in Thermopolis including the intersection with 6th Street. The project presented many challenges that were overcome to provide an economical design that met the needs of all involved.

WYDOT felt there would be considerable public interest in the project so they asked us provide artistic renderings of the intersection and retaining wall showing before and after scenarios. To improve visibility and sight distance at the intersection WYDOT needed to eliminate a median one block west of the intersection that had been there for many years. We used our GEOPAK road design software to generate the new pavement section without the median in this area. We then overlaid it on a digital photo and touched it up in a graphics program. These were used to help the public understand and visualize the impacts that the new construction would have on the aesthetics of the roadway.

Other design challenges included lowering the grade of the roadway about 1 foot down Old School Hill to allow better drainage and sight distance at 8th Street, providing new storm sewer up to 9th Street where the roadway sloped at about 7.5%, incorporating a 4 foot retaining wall along Old School Hill to maintain slope stability and designing a new intersection layout with bumpouts on the east side.

Rendering of 6th and Broadway

Click to Enlarge

Existing 8th St Intersection

Click to Enlarge